More than a century of construction expertise and support for
our virtual building services of today.
We Deliver Certainty.
AMP (Advanced Modeling Precision) is a team of experts in virtual design, working across the entire construction team to coordinate every level of the virtual model – from owner, to designer, to contractor, to trade.
AMP provides certainty, efficiency, security, and simplicity at every step of the process.
Proof:
- Level IV BIM Authority
- Educated, trained, and based in US
- We know the industry, not just the software – with 50 years of construction experience
- Reduces change orders, schedule overruns, and rework
With AMP, you build the project virtually, before anyone lifts a shovel – enabling problem solving before they even have a chance to develop.
WITH AN INDUSTRY STANDARD COST OF $3,100 PER CLASH, EACH FOOT MODELED BY AMP CONSULTING HAS THE POTENTIAL TO SAVE OWNERS TIME AND MONEY.
Square Feet Modeled
Clashes Resolved
Estimated Savings
Build Efficiently
We can help you save time and increase your project’s productivity, leaving money in your pocket.
Request a Quote
What We Offer
Our Virtual Building Services
AMP Consulting Team
20+ years of BIM experience on a variety of projects
- Virtual Construction Building
- Architectural shop drawings
- Mechanical system fabrication
- Field Point layout
- Laser Scanning
- Point cloud stitching
- Clash detection & resolution
- BIM software management
- BIM Consulting to the AEC industry
BIM News / Blog
See what we’re up to at AMP Consulting
BIM Case Study – Lorewood Grove Elementary School
In order to see that all designs were both accurate and efficient, EDiS Company brought in the AMP team. The AMP team had a complex job ahead of them:
Building Information Modeling – Preparing Projects for the Unexpected
In the same way nobody expected the impact that COVID had on our world, most owners do not expect the unexpected as they begin a construction project.
BIM Case Study – Toll Brothers Headquarters
The electrical system on a project the size of Toll Brother’s Headquarters is complex and challenging both to design and construct.
BIM Case Study – Appoquinimink School District’s Fairview Campus
The electrical systems on a project the size of the new high school, middle school, and performing arts center for Appoquinimink are complex and challenging both to design and construct. They are like dominos, requiring each step to be perfectly in line and in sync...